House Update: 1 Jan 2006
It is the new year and the house is coming along smartly.
Yesterday they started installing the flagstone for the side patios (generously financed by my father--we had originally cut the flagstone out of the initial construction in order to stay within budget). It looks great and will go a long way to making the exterior look a lot more finished.




Here is the downstairs bath with the travertine tile installed:

They also got the high-tech dog door installed:


The builder said they tested it out and that it's really really cool.
They have finished the exterior stone work except for the cap along the top edge:

The cap will be this light-colored sandstone:


This means that the exterior should be essentially complete by the end of the week. They expect to have the painting done in a couple of weeks. Julie has started ordering light fixtures and ceiling fans. I think they also plan to get the upstairs flooring installed this week.
The main outstanding interior item is the kitchen bar--they still need to pour the concrete pillars that go on each side of the bar--that should happen this week. Once that is in they can finish the bar and install the last bit of kitchen cabinetry.
Then we have to start selecting plumbing fixtures. I can hardly wait.
We seem to still be on track for move in some time in February.